Metal slitting machine

Metal slitting machine: metal slitting machine equipment is divided into three categories: simple metal slitting machine, hydraulic semi-automatic metal slitting machine, automatic metal slitting machine, metal slitting machine is mainly aimed at metal coil, such as strip steel, stainless steel, etc., slicing strip into several required specifications. Suitable for processing cold-rolled and hot-rolled carbon steel, silicon steel, tinplate, stainless steel and all kinds of metal coils after surface coating 2. Automation production process: This production line has basic functions of uncoiling, longitudinal shearing, tension, winding and so on. Its standard working equipment has uncoiling.

Metal slitting machine:

Metal slitting machine equipment is divided into three categories: simple metal slitting machine hydraulic semi-automatic metal slitting machine automatic metal slitting machine

Metal strip splitter is mainly aimed at metal coil, such as strip steel, stainless steel, etc. The strip is longitudinally cut into a number of required specifications strip. Suitable for processing cold-rolled and hot-rolled carbon steel, silicon steel, tinplate, stainless steel and coated metal coils


2, automated production process:

The production line has the basic functions of uncoiling, longitudinal shearing, tension and winding. Its standard working equipment consists of uncoiler, buffer pit, side guide position, longitudinal shearing machine and power, transition frame, waste edge reclaimer, back looper, tensioner, winding machine, hydraulic system, electrical system, etc. The production line is mainly composed of feeding trolley, uncoiler, leveler, longitudinal shear, waste edge winder, tensioner, winder and unloading device.


3. product features:

The  production line is controlled by PLC numerical control system. The  length is measured by encoder. Length, shear quantity and speed  information can be input into the PLC system, touch screen man-machine  settings, when the shear quantity is reached, the production line can  automatically stop. The speed of the production line can be adjusted. It  has high measuring accuracy, the whole line can work automatically, and  the operation is simple, and the sheet can be made.


4. Product parameters:


Model

metF500

met650

metF750

metF850

metF1100

metF1350

Working board width

460

620

720

820

950

1300

Working plate thickness

0.1-2.0

0.1-2.0

0.1-2.0

0.1-2.0

0.2-2.5

02-2.5

Number of common bars

10-20

10-20

10-20

10-20

10-20

10-20

Rated total power

33

33

33

37

37-45

37-45

Splitting velocity

0-100

0-100

0-100

0-100

0-70

0-70

Weight of retractable coil

5

5

5

6

8.5

10

Space space

4X15

4X16

4X18

4X18

6X22

6X22

Working board width

460

620

720

820

950

1300


Operating procedures

1. Purpose:

1.1  in order to better ensure the normal operation of the equipment,  effective guarantee of smooth production, meet product requirements.

1.2 effective maintenance of equipment.

1.3 write reasonable operation instructions to ensure the production plan and product quality requirements are reached.

2, scope of use:

Welded pipe production: bar and row production

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas and electricity, and whether the equipment is normal.

4, boot:

4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.

4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.

4.4  Let the motor run empty for 2-3 minutes before going to work every  morning. The transmission gears are equal to 0. When driving, the  operator is not allowed to leave the machine tool and do other  irrelevant things.

4.5 it is  strictly prohibited to wear gloves to boot, long sleeved clothes must  wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.

4.9  In the process of pipe-making, the cutting strip must be consented by  the workshop director, stored in the belt-laying area, and recorded in  detail with the sling operator on the Production Process Card. It must  not be discarded at will.

4.10  If abnormal phenomena are found in operation, such as smoke, burning  odor, sudden fuse burning, sudden extinguishment of indicator lights and  timely switching off the power switch to be checked out, then turn on  operation after troubleshooting.

4.11  the width of the product is always checked by the front and side wires,  and strictly controlled between the 2 divisions. steel strip

5, downtime:

5.1 turn off the power while the motor stops.

5.2 clean the gauges carefully with clean cotton cloth, place them in the box and put them into the toolbox.

5.3 clean up all the fixtures and fixtures on the machine tools and classify them into the toolbox.

6, on-site finishing or handover.

6.1 clean the surrounding 1 meters of equipment within 20 minutes before each shift, including the corresponding window sill.

6.2 clean the floor and the bottom of the machine tool and wipe the whole equipment clean.

6.3 hoist the finished product to the designated location.

6.4  After work, the specifications and weights produced by oneself are well  registered on the production record card, and the quality inspection  statistics are made by the workshop, and the "Production Process Card"  is filled in to explain the operation of the machine and the matters  needing attention of the successors. Clean the machine and the regional  health before leaving.


日韩国产欧美一区二区 | 国产精品色情无码视频A片 国产精品一区二区裸体美女 | A∨无码A片在线观看 | 国产又粗又长又爽视频 | 一级少妇精品内射自慰久久久久 | 熟女乱伦小说红桃视频 | 国产伦精品一区二区三区免费舒淇 | 一级二级三级黄色视频 | 熟女 人妻 人妻の偷拍 | 久久久久久蜜桃一区二区 | 精品国产污软件网站免费入口 | 成人色情影院第四色色影院 | 91人妻无码一区二区三区 | 岳的大肥坹一级A片无码视频 | 中文字幕第一页AV熟妇 | 欧美搡XXX搡888视频 | 水蜜桃在线观看视频 | 人人人人人做爰人人做爰 | 久久久无码精品亚洲A片消消乐 | 91亚洲精品国偷拍 | 免费无遮挡啪啪黑人 | 波多野结衣乳巨码无在线观看0 | 欧美人与ZOXXXX乱叫 | 无码人妻精品一区二区中文 | 日本A一片中国A一片 | 国产丨熟女丨国产熟女视频 | 黄片小视频在线观看免费 | 偷窥国产肥熟女一区二区 | 丰滿岳乱妇一区二区... | 国产特级婬片免费看 | 在线观看欧美日韩 | 中文字幕高清无码视频 | A片无码免费久久久秀色 | 波多野结衣乳喷高潮五分高潮 | 久久久麻豆精品一区二区 | 少妇人妻系列1~100 | 成人免费毛片 网站 | 91人妻人人做人人爽九色 | 亚洲少妇激情海角社区 | 日本丰满无码一区久久 | 亚洲无码一区二区在线观看 |