Embossing machine

Metal slitting machine: metal slitting machine equipment is divided into three categories: simple metal slitting machine, hydraulic semi-automatic metal slitting machine, automatic metal slitting machine, metal slitting machine is mainly aimed at metal coil, such as strip steel, stainless steel, etc., slicing strip into several required specifications. Suitable for processing cold-rolled and hot-rolled carbon steel, silicon steel, tinplate, stainless steel and all kinds of metal coils after surface coating 2. Automation production process: This production line has basic functions of uncoiling, longitudinal shearing, tension, winding and so on. Its standard working equipment has uncoiling.

Metal slitting machine:

Metal slitting machine equipment is divided into three categories: simple metal slitting machine hydraulic semi-automatic metal slitting machine automatic metal slitting machine

Metal strip splitter is mainly aimed at metal coil, such as strip steel, stainless steel, etc. The strip is longitudinally cut into a number of required specifications strip. Suitable for processing cold-rolled and hot-rolled carbon steel, silicon steel, tinplate, stainless steel and coated metal coils

2, automated production process:

The production line has the basic functions of uncoiling, longitudinal shearing, tension and winding. Its standard working equipment consists of uncoiler, buffer pit, side guide position, longitudinal shearing machine and power, transition frame, waste edge reclaimer, back looper, tensioner, winding machine, hydraulic system, electrical system, etc. The production line is mainly composed of feeding trolley, uncoiler, leveler, longitudinal shear, waste edge winder, tensioner, winder and unloading device.

3. product features:

The  production line is controlled by PLC numerical control system. The  length is measured by encoder. Length, shear quantity and speed  information can be input into the PLC system, touch screen man-machine  settings, when the shear quantity is reached, the production line can  automatically stop. The speed of the production line can be adjusted. It  has high measuring accuracy, the whole line can work automatically, and  the operation is simple, and the sheet can be made.


4. Product parameters:

Model

metF500

met650

metF750

metF850

metF1100

metF1350

Working board width

460

620

720

820

950

1300

Working board width

0.1-2.0

0.1-2.0

0.1-2.0

0.1-2.0

0.2-2.5

02-2.5

Number of common bars

10-20

10-20

10-20

10-20

10-20

10-20

Rated total power

33

33

33

37

37-45

37-45

Splitting velocity

0-100

0-100

0-100

0-100

0-70

0-70

Weight of retractable coil

5

5

5

6

8.5

10

Space space

4X15

4X16

4X18

4X18

6X22

6X22

Working board width

460

620

720

820

950

1300



Operating procedures

1. Purpose:

1.1  in order to better ensure the normal operation of the equipment,  effective guarantee of smooth production, meet product requirements.

1.2 effective maintenance of equipment.

1.3 write reasonable operation instructions to ensure the production plan and product quality requirements are reached.

2, scope of use:

Welded pipe production: bar and row production

3, rules:

3.1 ensure the effective cleaning of equipment and record of cleanliness during shift.

3.2  accurately control the operation of the machine before shift and  coordinate with normal production. Pay attention to the opening of  water, gas and electricity, and whether the equipment is normal.

4, boot:

4  before starting, according to the lubrication requirements, injecting  different lubricants to the parts where the lubricating oil is required  to be injected.

4.1 first check whether the electrical switches are in the 0 position, then turn on the power supply.

4.2  Check whether the mechanical parts and pneumatic system are normal or  not. If there are abnormal phenomena, they should be checked and  eliminated in time so as not to cause mechanical equipment accidents.

4.3  Check the transmission gear is correct, otherwise there will be quality  problems, whether the pressure gauge of the cutting machine reaches  0.5-0.7 mpa, otherwise it can not be cut.

4.4  Let the motor run empty for 2-3 minutes before going to work every  morning. The transmission gears are equal to 0. When driving, the  operator is not allowed to leave the machine tool and do other  irrelevant things.

4.5 it is  strictly prohibited to wear gloves to boot, long sleeved clothes must  wear hand sleeves, and long hair must wear a hat.

4.6 do not wipe the rotating parts when starting.

4.7 correctly adjust the mold, not vigorously under pressure, in place.

4.8  during the operation, you are not allowed to leave the machine tool.  You are not allowed to do other irrelevant things, and pay attention to  whether the welds are normal.

4.9  In the process of pipe-making, the cutting strip must be consented by  the workshop director, stored in the belt-laying area, and recorded in  detail with the sling operator on the Production Process Card. It must  not be discarded at will.

4.10  If abnormal phenomena are found in operation, such as smoke, burning  odor, sudden fuse burning, sudden extinguishment of indicator lights and  timely switching off the power switch to be checked out, then turn on  operation after troubleshooting.

4.11  the width of the product is always checked by the front and side wires,  and strictly controlled between the 2 divisions. steel strip

5, downtime:

5.1 turn off the power while the motor stops.

5.2 clean the gauges carefully with clean cotton cloth, place them in the box and put them into the toolbox.

5.3 clean up all the fixtures and fixtures on the machine tools and classify them into the toolbox.

6, on-site finishing or handover.

6.1 clean the surrounding 1 meters of equipment within 20 minutes before each shift, including the corresponding window sill.

6.2 clean the floor and the bottom of the machine tool and wipe the whole equipment clean.

6.3 hoist the finished product to the designated location.

6.4  After work, the specifications and weights produced by oneself are well  registered on the production record card, and the quality inspection  statistics are made by the workshop, and the "Production Process Card"  is filled in to explain the operation of the machine and the matters  needing attention of the successors. Clean the machine and the regional  health before leaving.


97精品伊人久久久大香线蕉97 | 蜜桃aⅴ色欲A片无码精品接吻 | 中国一区二区三区免费看 | 国产精品视频一区99 | 一日本道电影亚洲色综合 | 精品国精品国产自在久不卡 | 99精产国品在线观看 | 国产妓女精品一区二区 | 亚洲无 码A片在线观看 | 波多野无码丰满尖叫高潮 | 国产无遮挡A片又黄又爽 | 一级片在线免费观看 | 四川少妇搡BBw搡BBBB搡 | 嫩bbb搡bbbb搡视频 | AAA一级黄色视频 | 国产成人无码AV一区二区 | 国产精品JIZZ在线观看99 | 免费观看婬乱男女婬视频 | 中文字幕在线观看视频一区 | 亚洲精品久久激情国产片 | 10000部成人A片无码播放 | 91精品秘 无码一区二区 | 在线观看免费视频麻豆 | 东北少妇BBBB搡BBB搡 | 国产午夜精品一区二区三区四区 | 国产无套精品一区二区三区 | 国产激情视频在线观看 | 久久精品久久久精品美女 | 一级婬片试看15分钟口咬 | 粗大的内捧猛烈进出A片 | 亚洲熟伦熟女新五十路熟妇 | 午夜成人裸体视频在线 | 91丨国产丨白浆秘 冰块 | 免费毛片高潮一级一级 | 苍井空亚洲一区二区三区 | 丰满熟女人妻一区二区三 | 青青 狠狠 人人91 | 欧一美一性一交一黄一片 | 美女淫荡视频网站免费观看 | 黄网站在线看免费入口 | 国产精品不卡在线观看 |